Emergency Generator 4-hour Load Test

Can the generator load bank test be combined to meet the 36-month test as well as the 4-hour load test?

Any examples are for illustrative purposes only.

The testing for an annual load bank test and the triennial exercise may be combined according to NFPA 110-2010: 8.4.9.7.
Summary of testing:
Monthly load testing of at least 30% of the nameplate rating for 30 minutes for diesel powered emergency power supplies (EPS), see NFPA 110-2010: 8.4.9.1, EC.02.05.07 EP5 and EP6. The cool-down period (load disconnected) does not count as part of the 30 minutes test.

Annual load test (for situations not meeting monthly testing requirements) for diesel powered EPS
• at least 50% of the nameplate rating for 30 minutes
• at least 75% of the nameplate rating for 1 hour
• Total test duration of not less than 1.5 continuous hours, see EC.02.05.07 EP6

Triennial or 36-month generator test 30% of nameplate rating for 4 continuous hours for diesel powered EPS, see EC.02.05.07 EP and EP10.
When combining both tests for diesel powered EPS, the first three hours of the test is required to be not less than 30% of the emergency generator nameplate kW rating or the minimum exhaust gas temperature. The last hour cannot be less than 75% of the emergency generator nameplate kW rating for a total of 4 continuous hours.
Note: This testing is required for level 1 and level 2 systems. Level 2 systems must have completed the triennial test by January 1, 2021. 
References: NFPA 110-2010 edition, CAMH: EC.02.05.07
Last updated on February 24, 2020
Manual: Hospital and Hospital Clinics
Chapter: Environment of Care EC

If no, please comment on how we could improve this response.

If you have additional standards-related questions regarding this topic, please use the Standards Online Submission Form