Medication - Sterile Compounding - Secondary Engineering Control (SEC) Testing/Certification Requirements

What testing is required for our Secondary Engineering Controls ?

Any examples are for illustrative purposes only.

The following items are expected to be tested at a minimum with a frequency not to exceed 6 month intervals.  Lack of testing of these items will result in non-compliance with Joint Commission standards.
  • Air exchanges per hour of the buffer area
  • Pressure differential (between buffer area/ante area; ante area/non-classified area)
  • ISO level of the buffer area and ante area
  • Viable particle testing surface of the buffer area and ante area
  • Viable particle testing air—HEPA filter leak test of HVAC HEPA filter system
  • Evidence of remediation/retesting if assessed levels were not in compliance with those listed in USP 797
 
Manual: Critical Access Hospital
Chapter: Medication Management MM
First published date: January 23, 2018 This Standards FAQ was first published on this date.
This page was last updated on November 01, 2021

If no, please comment on how we could improve this response.

If you have additional standards-related questions regarding this topic, please use the Standards Online Submission Form