Q: Is semiannual calibration verification required if the laboratory is performing calibration at least once every six months?
A: Semiannual calibration verification is not required when the laboratory performs a calibration protocol using 3 or more levels of calibration materials that include a low, mid, and high value at least once every 6 months. After calibration, quality control should be performed and documented to verify the calibration protocol was successful.